Skytek Aircraft Services
  • Home
  • About
    • Aircraft Maintenance
    • Zenith Build Center
  • Store
    • Beechcraft® King Air​® Ice Shields
    • NEW Air-Port Ramp
    • Rotax Aircraft Engines
    • Zenith Aircraft Parts
    • Certified Aircraft Parts >
      • NEW Certified Aircraft Parts
      • USED Certified Parts
  • Contact
  • Zenith 750 w/ 915 (✔)
  • >
  • Fuel System Kits - 916is
  • >
  • Fuel Pump Mounting Kit EXPOSED Pumps ONLY - 912is, 915is, 916is

Fuel Pump Mounting Kit EXPOSED Pumps ONLY - 912is, 915is, 916is

SKU: SFS 95KEP
$593.68
$593.68
Unavailable
per item
This Fuel Pump-to-Firewall Mounting Kit includes all the hardware to mount the electric fuel pumps to the firewall. It is for EXPOSED PUMPS ONLY and has all the fittings required to plumb them together.
  • Facebook
  • Twitter
  • Pinterest
  • Google+
Add to Cart

​INSTALLATION INSTRUCTIONS

STEP 1: Layout on Firewall

Layout on the firewall the two holes shown on a diagonal line below. 

NOTE: Place fuel pump assembly in place before drilling to verify there is no interference with the battery box and the inside edge of the diagonal brace. 
Picture

STEP 2:

Assemble the fuel pumps with the fittings provided to look like the picture below. 
​
NOTE: The direction of the pumps and the direction of the one way valves (THIS IS CRITICAL). 

Place the clamps provided with your pumps over the pumps as shown, and lock wire the clamps in the closed position as if there was a bolt in them.
Picture
Place the pumps in position with the two corresponding clamps over the marked holes. Verify there is space between the battery box and the pump assembly. Relocate it if needed but, ensure it remains on the diagonal line. You will be able to slide the upper adel clamps as required to get the optimal fit. 

NOTE: The picture above shows the two holes drilled, please ensure that you first fit the pumps before drilling as per Step 1. 
Picture

STEP 3:

Drill the two marked or relocated holes to 1/4".  Place AN4-6A bolts in them and position the remaining two clamps as shown above. Mark for the two holes required. Remove pumps and drill holes to 1/4". Deburr all holes. 

Place AN4-5A bolts in the other two holes and position pumps in place on the firewall. Install (AN960-416 small diameter) washers on the bolts running through the diagonals and the Large penny washers on the other two bolts with the fiber lock nuts. Remove lock wire, tighten this assembly to your fire wall. 
​
Verify all connections to the pump assembly are tight.
Picture
Picture

Thank you for doing business with us!

If you have time, we would love it if you dropped us a review!
Write a Review
Services
Zenith Build Center
​Aircraft Maintenance
​Helicopter Maintenance

Information
Contact Us
​About Us
Store
Zenith/Rotax Complete Packages
Zenith/Rotax Individual Kits
Zenith Optimization Kits
Rotax Aircraft Engines
​NEW Certified Aircraft Parts
USED Certified Aircraft Parts



© Copyright 2018 Skytek Aircraft Services Ltd.

  • Home
  • About
    • Aircraft Maintenance
    • Zenith Build Center
  • Store
    • Beechcraft® King Air​® Ice Shields
    • NEW Air-Port Ramp
    • Rotax Aircraft Engines
    • Zenith Aircraft Parts
    • Certified Aircraft Parts >
      • NEW Certified Aircraft Parts
      • USED Certified Parts
  • Contact